能看黄色电影的网站-嗯嗯嗯 天天干-你懂的91午夜福利视频-你去二区三区3D动漫-柠檬福利第一导航在线-妞操网

Current Location:Home > Product > IF induction series > Silicon controlled medium frequency forging furnace

2020-07-21 16:25:04

Share
  • Share to WeChat Moments

Infrared temperature measurement forging furnace

  • Description

Operation steps of infrared temperature measurement forging heating furnace

1) Passing water: Start the water pump and observe whether the water flow at the water outlet is normal.

2) Power on: first close the knife, then turn on the air switch at the back of the machine, and then turn on the power switch on the control board.

3) Setting: Select the operation mode (full automatic, semi-automatic, manual and foot control) according to your needs. When automatic and semi-automatic control, you need to set the heating time, holding time and cooling time (each time cannot be set to 0, otherwise it will not work properly). automatic cycle). Before using it for the first time and before you are proficient, you should use manual or foot control.

4) Startup: Before each start, the heating power potentiometer should be adjusted to the minimum as much as possible, and then slowly adjust the temperature to the required power after starting. Press the start button to start the machine, at this time the heating indicator on the panel is on, and there will be a sound of normal work and the simultaneous flashing of the work light.

5) Observation and temperature measurement: During the heating process, visual inspection is mainly used to determine when to stop heating based on experience. Inexperienced operators can use a thermostat to detect the temperature of the workpiece.

6) Stop: When the temperature reaches the requirement, press the stop button to stop heating. You can start it again after replacing the workpiece.

7) Shutdown: The machine can work continuously for 24 hours. The power switch should be turned off when not in use, and the knife or the air switch behind the machine should be turned off when not in use for a long time. When shutting down, the power should be cut off first and then the water should be cut off, so as to facilitate the heat dissipation inside the machine and the heat of the induction coil. Note: The machine should not work without load as much as possible, let alone run without load for a long time, otherwise, it will affect the performance and stability of the machine!


Maintenance of Forging Furnace with Infrared Temperature Measurement

When used in places with poor air environment, dust should be prevented from entering the inside of the machine, and water must not be splashed into the machine. To keep the cooling water clean, change it regularly. High temperature environment should maintain air circulation.

高頻10.jpg



Recommended Products

HOME About Us Product News Case Video Advantages Contact
主站蜘蛛池模板: 国产香线蕉手机在线观看 | 国产亚洲精品综合一区 | 国产精品观看一区二区三区 | 精品一区二区三区日韩 | 日韩欧美中文字幕在线观看一区 | 日韩亚欧美一二三四视频 | 微拍福利88 | 欧美特黄视 | 国产午夜福利精品一 | 欧美日韩岛国 | 强奷乱码中文字幕 | 日韩色区 | 在线精品国产一区二区三区 | 亚洲激情 | 国产suv精品一区二区62 | 日本久本草 | 欧美日韩精品一区二 | 日本新janpanese乱熟 | 日韩视频www永 | 国产精品亚洲午夜不卡 | 综合五月激情二区视频 | 国产精品自拍视频首页 | 欧美在线人成北岛玲 | 欧美日韩加勒比一区二区三区 | 国色一卡2卡二卡4卡乱码 | 女女同性女同区二区国产 | 99精品全国免费观看视频 | 97国产精品系列在线观看 | 国产精品视频一二三区 | 99在线视频免费观 | gogogo高清视频高清大全 | 国产蝌蚪视频一区二区三区 | 亚洲国产一区二区在线免费 | 国产精品亚洲专区一区 | 精品亚洲日韩国产一二三区 | 国产日韩欧美一区二 | 黑人巨大精品欧美一区二区 | 亚洲а∨精品天堂在线 | 欧美亚洲国产清纯综合图区 | 国产精品广西柳州 | 泰剧tv网 |