能看黄色电影的网站-嗯嗯嗯 天天干-你懂的91午夜福利视频-你去二区三区3D动漫-柠檬福利第一导航在线-妞操网

Current Location:Home > Product > Steel wire annealing > Aluminum bar forging furnace

2020-07-20 17:48:44

Share
  • Share to WeChat Moments

Round steel forging diathermy equipment

  • Description

圖片012.png

Operation steps of round steel forging diathermy equipment and bar diathermy forging equipment

1) Passing water: Start the water pump and observe whether the water flow at the water outlet is normal.

2) Power on: first close the knife, then turn on the air switch at the back of the machine, and then turn on the power switch on the control board.

3) Setting: Select the operation mode (full automatic, semi-automatic, manual and foot control) according to your needs. When automatic and semi-automatic control, you need to set the heating time, holding time and cooling time (each time cannot be set to 0, otherwise it will not work properly). automatic cycle). Before using it for the first time and before you are proficient, you should use manual or foot control.

4) Startup: Before each start, the heating power potentiometer should be adjusted to the minimum as much as possible, and then slowly adjust the temperature to the required power after starting. Press the start button to start the machine, at this time the heating indicator on the panel is on, and there will be a sound of normal work and the simultaneous flashing of the work light.

5) Observation and temperature measurement: During the heating process, visual inspection is mainly used to determine when to stop heating based on experience. Inexperienced operators can use a thermostat to detect the temperature of the workpiece.

6) Stop: When the temperature reaches the requirement, press the stop button to stop heating. You can start it again after replacing the workpiece.

7) Shutdown: The machine can work continuously for 24 hours. The power switch should be turned off when not in use, and the knife or the air switch behind the machine should be turned off when not in use for a long time. When shutting down, the power should be cut off first and then the water should be cut off, so as to facilitate the heat dissipation inside the machine and the heat of the induction coil. Note: The machine should not work without load as much as possible, let alone run without load for a long time, otherwise, it will affect the performance and stability of the machine!


Maintenance of round steel forging diathermy equipment and bar diathermy forging equipment

When used in places with poor air environment, dust should be prevented from entering the inside of the machine, and water must not be splashed into the machine. To keep the cooling water clean, change it regularly. High temperature environment should maintain air circulation.

高頻10.jpg


Recommended Products

HOME About Us Product News Case Video Advantages Contact
主站蜘蛛池模板: 女人扒开屁股让男人桶爽 | 国产卡二卡3卡4卡四卡 | 国产不卡在线观看免费视频 | 被蹂躏的奶水2在线播放 | 18岁禁止入内 | 国产精品欧美日韩一二三四 | 日本成熟丰满老妇xxxx | 二区三区女 | 国产久在线观看免费视频 | 国产性午夜视频在线观 | 日本亚洲黑人 | 亚州国产精品一线北 | 国产成视频在线观看 | 欧美影视三级亚洲 | 91精品啪国产在线观看 | 欧美日韩色黄大片在线视频 | 国产精品成人ⅴa在线观看 俺去啦不卡 | 51妺妺嘿嘿午夜福利 | 日本黄大片在线观看 | 日本高清免费不卡视频 | 7777在线| 欧美最大网永久免费观看 | 小明加密通道最新三 | 国产午夜理论片不卡在线观看 | 日韩电影院 | 国产精品lululu在线观 | 欧美性hd正在播放淫亚洲 | 国产精华液和欧美的精华液 | 国产亚洲欧美日韩综合一 | 国产99精品视频一区二区三区 | 蜜桃传媒在 | 91桃色 | 国产***尤物在线一级 | 在线精品一区二区三区不卡 | 国产成a人片在线观看视频首页 | h在线观看情趣视频 | 99r在线精品视频在线播放 | 成人国产一区二区 | 亚洲人成激情在线播放 | 国产精品俺来也在 | 91大神精品国产视频免费91 |